Maintenance

The years after handover.

A solar system is a twenty-five year asset judged on what it generates in year seven. Maintenance is sold here as a product, with scope and response times in writing — not as a favour after something fails.

01 / Cover

Three levels of cover, priced against your load.

01

Essential

Residential rooftop up to 5 kW

  • Two panel cleaning visits a year, timed before and after monsoon
  • Generation compared against the commissioning baseline
  • Inverter fault log review and firmware check
  • Board inspection: terminations, breaker ratings, earthing continuity
  • Written visit report with readings you keep

Priced after a first inspection visit, so the contract matches what is actually installed.

02

Standard

Homes with heavy load, shops and clinics

  • Everything in Essential, four visits a year
  • Thermal imaging of the main board and inverter terminations
  • Earth resistance measured and logged each visit
  • Lighting circuit and driver check with lamp replacement labour included
  • Priority response: same working day for a total outage

Priced after a first inspection visit, so the contract matches what is actually installed.

03

Industrial

Sheds, workshops and plants on three-phase

  • Scheduled shutdown-window maintenance planned around production
  • Panel, starter, VFD and capacitor bank inspection
  • Phase balance and voltage-drop measurement on long runs
  • Thermal audit of all main joints under load
  • Response commitment agreed in the contract, not left to goodwill

Priced after a first inspection visit, so the contract matches what is actually installed.

02 / Why it matters

Under-generation is quiet until it is expensive.

Dust costs more than shading here

Marathwada dust can take 10–20% off output before anyone notices. Cleaning on a schedule recovers it; cleaning when you remember does not.

Boards fail at the terminations

Loose or heating joints show up on a thermal image months before they trip a breaker or damage an inverter.

A baseline makes claims possible

Because commissioning yield is recorded, a warranty claim on a module or inverter is backed by data instead of an argument.

A number that actually answers

One contact for the system we installed. Response times are written into the contract.

Credentials

Registered, licensed, and quoting only subsidy-eligible hardware.

ALMM compliance. We quote only ALMM-listed panels and inverters, so your subsidy file cannot be rejected on hardware. Make, model and list reference go into the quote before you pay anything.

Licence, GST and Udyam registration numbers are shared with every quotation and on request over WhatsApp or a call.

Service area

Latur city and the surrounding taluka — Ausa, Udgir, Nilanga, Ahmedpur and Chakur. Surveys are free within the district.

Office pin: Latur, Maharashtra, India. The exact plot pin follows Google Business Profile verification.

03 / Next step

A free survey, then honest numbers.

Tell us where you are and what you need. We come, we measure, and we quote what the building actually requires.

+91 78881 58812 · Latur, Maharashtra, India

Enquiry

Book a site visit

+91
What do you need?

We'll WhatsApp you within one working day. No call centre, no spam.

Call WhatsApp