Work
Sites we've wired and switched on.
We haven't published client photography yet — it's being collected from current installations. Below are the system types we build most often, with real specs. Filter by category or open any card for full details, and ask us for site references on WhatsApp in the meantime.
Showing 8 system types
Project photography from our current installations is being added this month. Ask us for site references in the meantime — we'll share them on WhatsApp.
02 / Handover
Every job leaves the same paperwork behind.
Whatever the system type, the documentation is identical — because that is what you own for the next twenty-five years.
| Item | Standard we specify | Why it matters |
|---|---|---|
| Single-line diagram | As-built SLD showing every way, rating and label on the board | The next electrician inherits a drawing instead of guessing which breaker feeds what. |
| Bill of materials | Itemised make, model and rating for modules, inverter, protection and cable | You can verify what was installed against what was quoted, line by line. |
| Test readings | Insulation resistance, earth continuity, earth pit resistance and RCD trip times | Safety claims mean nothing without measured numbers written down on handover day. |
| Generation baseline | Commissioning-day yield recorded for solar systems | Under-generation shows up against a baseline within weeks, not a year later. |
| Warranty pack | Module, inverter and workmanship warranty terms collected in one file | A claim two years later needs paperwork you can actually find. |
| Service plan | Cleaning and inspection schedule with written response times | Systems are judged over 25 years; handover day is the start of the relationship, not the end. |
- Single-line diagram
- As-built SLD showing every way, rating and label on the board
- The next electrician inherits a drawing instead of guessing which breaker feeds what.
- Bill of materials
- Itemised make, model and rating for modules, inverter, protection and cable
- You can verify what was installed against what was quoted, line by line.
- Test readings
- Insulation resistance, earth continuity, earth pit resistance and RCD trip times
- Safety claims mean nothing without measured numbers written down on handover day.
- Generation baseline
- Commissioning-day yield recorded for solar systems
- Under-generation shows up against a baseline within weeks, not a year later.
- Warranty pack
- Module, inverter and workmanship warranty terms collected in one file
- A claim two years later needs paperwork you can actually find.
- Service plan
- Cleaning and inspection schedule with written response times
- Systems are judged over 25 years; handover day is the start of the relationship, not the end.
Standard we specify
Why it matters
Standard we specify
Why it matters
Standard we specify
Why it matters
Standard we specify
Why it matters
Standard we specify
Why it matters
Standard we specify
Why it matters
03 / Service area
Latur district first. Marathwada on request.
04 / FAQ
Questions about our work.
We are collecting site photography from current installations with owner permission rather than using stock or borrowed images. Until then we publish system types with real specifications, and share site references directly on WhatsApp.
Yes. We arrange site references in and around Latur where the owner is happy to host. Ask on WhatsApp and we will match you to a system of a similar size and type.
Latur district as our core service area, with commercial and industrial work across Marathwada. Distance affects the survey schedule, not the standard of the installation.
No. Design, wiring, board build, earthing and commissioning are done by our own team, which is why the test readings on the handover sheet are ours to sign.
05 / Next step
A free survey, then honest numbers.
Tell us where you are and what you need. We come, we measure, and we quote what the building actually requires.
+91 78881 58812 · Latur, Maharashtra, India